
In addition, two unattended kitchenettes were built, one on the first floor and one on the second floor. The two accessible toilets, one on the 1st floor and one on the 2nd floor, were enlarged in accordance with the requirements of SIA standard 500. A shower for staff was also installed on the 2nd floor.